Gaggenau AW 400120 Çalıştırma ve Kurulum Talimatları - Sayfa 17

Havalandırma Davlumbazı Gaggenau AW 400120 için çevrimiçi göz atın veya pdf Çalıştırma ve Kurulum Talimatları indirin. Gaggenau AW 400120 20 sayfaları.

Gaggenau AW 400120 Çalıştırma ve Kurulum Talimatları
6
Attach the extractor hood.
Adjust the height and align horizontally with the
adjusting screws.
Check that the 4 lower fixing holes have
been correctly marked. If required, mark again.
7
Remove the extractor hood. Drill the 4 lower
8 mm ø fixing holes and press in the wall plugs
flush with the wall.
397
94
min. 600 Elektro
700 Gas
Empfehlung 700
270
160
8
Attach the extractor hood and screw into
position with the remaining 4 screws.
9
Stick protective film over the holes of the 2
lower mounting bolts in the protective grid.
10 Connect up the air outlet pipe.
11 Connect the hood to the electricity supply.
17