AFFIX MADW 920-AGR Montaj Kılavuzu - Sayfa 12

Masaüstü AFFIX MADW 920-AGR için çevrimiçi göz atın veya pdf Montaj Kılavuzu indirin. AFFIX MADW 920-AGR 20 sayfaları. Aluminium double width mobile towers

AFFIX MADW 920-AGR Montaj Kılavuzu
ASSEMBLY
Step 11
Step 11.1
Step 11.1
Hook the Working Trapdoor platform on
the 2nd Rung of the 3rd level frames.
Make sure the trapdoor is towards the
ladder side.
Step 11.2
Step 11.2
Also hook the Fixed platform beside the
Trapdoor platform on the same rungs
Step 12
Step 12.1
Step 12.1
Clamp the 4 plastic toe-board holders on
all the 4 corners of the working platform
level, around the working platform.
For more details, refer to Toe-board
Assembly Details on Page 12
Step 12.2
Step 12.2
Insert the wooden toe-boards in the
toe-board holder on all the 4 sides.
11