Celestica Athena Erp lot9 EcoDesign Manuel - Sayfa 15

Kontrolör Celestica Athena Erp lot9 EcoDesign için çevrimiçi göz atın veya pdf Manuel indirin. Celestica Athena Erp lot9 EcoDesign 16 sayfaları.

Battery Backup Units

Type and number of fastenings: One (1) BBU handle.
Tools required: None.
Procedure: Pull the TPM card out of the slot.
1) Rotate the BBU handle.
2)
Pull the BBU out of the canister.
15