AUTOMATION 2000 DGPT2-IB Teknik Talimatlar - Sayfa 4
Transformatör AUTOMATION 2000 DGPT2-IB için çevrimiçi göz atın veya pdf Teknik Talimatlar indirin. AUTOMATION 2000 DGPT2-IB 17 sayfaları.
When you tighten the HM8 bolts on the DGPT2
The tighten coupling is not higher than 3 m.kg (30 N.m).
The DGPT2
(the FPM seal should stay visible – approx. 1 or 2 mm).
The DGPT2
steps. During the first step, use a loose tighten coupling on all fixing hooks.
During the second step, use a tighten coupling not higher than 3 m.kg
(30 N.m).
The DGPT2
drain tap's leakproofness is insured by a FPM seal positioned at the root of
®
the screw thread undercut.
NEVER USE Teflon
leakproofness through its screw thread.
TECH. INSTRUCTIONS
DGPT2
®
A U T O M A T I O N 2 0 0 0
T
IGHTENING PRECAUTIONS
attachment flange DOES NOT TOUCH the transformer cover
®
fixing hooks are tightened one after the other, clockwise in two
®
L
EAKPROOFNESS PRECAUTIONS
tape (or similar tape) to insure the DGPT2
®
fixing hooks, make sure that:
®
Page
N° T/NOT-0021
4
drain tap's
®
Rev.
Date: 28/09/16
7