Gaines Janzer Double Post Kurulum ve Montaj

Posta Ekipmanları Gaines Janzer Double Post için çevrimiçi göz atın veya pdf Kurulum ve Montaj indirin. Gaines Janzer Double Post 2 sayfaları.

The Janzer Double Post
Included with Post
2 each - Arm Clip
2 each - Mounting Plate
20 each – 1/4-20 x 1/2 Screws
4 each - Screw Cover
DOUBLE MOUNT POST
Post Installation:
Customers are required to contact the local post office before installing the mailbox to ensure the correct
placement and height. The post hole should usually be located to adhere to the following guidelines
(please see diagram). The mailbox floor generally should be 40-44 inches from the road surface and front
face of the mailbox is generally 6-8 inches from front face of curb or road edge.
A. Double Post – In this configuration the hole will generally be 16"-18" from face of post to street.
Once the desired post spot is determined, dig a 12" diameter hole to the depth needed. The depth
of the hole will depend on your desired height of mailbox. Place the post into the hole with
threaded holes on the post facing the sides you intend to mount the mailboxes on. The top of the
post is the end that the holes on the post are closest to. Use a spirit level to set post to true vertical
position in the post hole. Be sure to align the face of the post with the driveway, sidewalk,
walkway, roadway, etc. Pour concrete completely around the post, taking care to maintain the
level of the post. Cover concrete with top soil if desired. If you are installing a Decorative Cuff
(accessory sold separately) please follow the instructions with the Cuff at this point. Once
completed, please continue with these instructions.
Installation & Assembly
:
1 each - Post Finial
2 each - Post Arm
8 each - 1/4 x 1 Fender Washer
4 each - Screw Cover Retainer
POSITION GUIDELINES
Page 1 of 2