Automationdirect.com Productivity 2000 P2-32ND3-1 Manuel - Sayfa 3

Kontrol Ünitesi Automationdirect.com Productivity 2000 P2-32ND3-1 için çevrimiçi göz atın veya pdf Manuel indirin. Automationdirect.com Productivity 2000 P2-32ND3-1 4 sayfaları. Dc input

Automationdirect.com Productivity 2000 P2-32ND3-1 Manuel
Wiring Options
1
ZIPLink Feed Through Modules and Cables¹
ZL-RTB40
Note: P2-32ND3 is UL/CUL listed when used with ZL-RTB40
LED Sensor Input
ZL-LTB32-24-1
TB5
TB6
2
1
2
1
D1
D2
D3
D4
D5
D6
D7
D8
D9
D10
D11
D12
D13
D14
D15
D16
D17
D18
D19
D20
D21
D22
D23
D24
9
1
9
1
9
10
10
10
18
18
18
19
19
19
27
27
27
2
ZIPLink Pig Tail Cables
3
Accessories²
1.Cable + ZIPLink Module = Complete System
2. ZL-RTB-COM provides a common connection point for power or ground
Sales 800-633-0405
ZL-RTB40
ZL-RTB-40-1
ZL-RTB40-1
TB7
TB8
1
2
1
2
D25
D26
D27
D28
D29
D30
D31
D32
ZL-LTB32-24-1
1
9
18
27
0.5 m (1.6 ft) cable
ZL-CBL40
1.0 m (3.3 ft) cable
ZL-CBL40-1
2.0 m (6.6 ft) cable
ZL-CBL40-2
1.0 m (3.3 ft) cable
ZL-P3-CBL40-1P
2.0 m (6.6 ft) cable
ZL-P3-CBL40-2P
ZL-RTB-COM
TW-SD-SL-1
TW-SD-MSL-1
Wiring Diagram and Schematic
Equivalent Input Circuit
Internal Module Circuitry
12–24 VDC
INPUT
+
+
COM
12–24 VDC
+
12–24 VDC
+
12–24 VDC
+
12–24 VDC
+
www.productivity2000.com
Optical Isolator
3