Highland heat Kompakt 16 Kullanıcı Kılavuzu - Sayfa 9

Kazan Highland heat Kompakt 16 için çevrimiçi göz atın veya pdf Kullanıcı Kılavuzu indirin. Highland heat Kompakt 16 20 sayfaları. Solid fuel boiler

Kompakt
4. Boiler installation

4.3 Connecting the boiler to the chimney

The chimney must be installed to meet the requirements of the
country where it is installed. The recommended chimney draft
is 15-20 Pa. The minimum chimney liner recommended by the
boiler manufacturer dimensions are:
• diameter of round insert – 150 mm;
• dimensions of the square insert - 140x140 mm.
The boiler flue pipe must be connected to the flue itself with
a rigid steel connection of suitable cross-section, shape and
thickness. The connection of the solid fuel boiler to the chimney
must be properly insulated to prevent burns

4.4 Connecting the boiler to the central heating system

Delegate the work of connecting the boiler to properly qualified
specialists.
In order to extend the service life of the boiler and to ensure
adequate comfort of use, it is necessary to follow such an
installation scheme that ensures the maintenance of the
working temperature of the boiler not below 60°C. With the help
of a specialist, make sure that the condition of the boiler, the
tightness of the plumbing connections and the flue and the
components are working properly. In a closed heating system,
there must be a thermal expansion compensation vessel of
suitable capacity (at least 10% of the total liquid volume in
the system). The use of safety valves or valves that limit the
flow in a closed heating system is prohibited. Recommended
connection schemes are presented in subsection 4.5.
9