HighPoint R1000 Series Hızlı Kurulum Kılavuzu - Sayfa 5
Bilgisayar Donanımı HighPoint R1000 Series için çevrimiçi göz atın veya pdf Hızlı Kurulum Kılavuzu indirin. HighPoint R1000 Series 10 sayfaları. 4x m.2 port to pcie 3.0 x8/x16 nvme hba's
Ayrıca HighPoint R1000 Series için: Hızlı Kurulum Kılavuzu (8 sayfalar), Hızlı Kurulum Kılavuzu (9 sayfalar)
Step 3. This will expose the two thermal pads. The blue film must be
removed from each pad before reinstalling this panel. This film
protects the pads from damage and foreign objects prior to
installation, but will also prevent the pad from transferring heat
away from the NVMe SSD's and controller componentry.
Step 4. These 8 screws are used to install the NVMe SSD's.
5