Galvin Engineering CliniLever TCWSC80C Kurulum Manüelleri - Sayfa 5

Sıhhi Tesisat Ürünleri Galvin Engineering CliniLever TCWSC80C için çevrimiçi göz atın veya pdf Kurulum Manüelleri indirin. Galvin Engineering CliniLever TCWSC80C 5 sayfaları. Hospital wall sink set taps w/ 190 gooseneck outlet

Product Installation Guidelines
SERVICE AND MAINTENANCE
JUMPER VALVE TAPWARE
1. Turn off the water supply and turn on the tap
handle to drain water from the bodies.
2. Remove the temperature indicator from the
handle.
3. Remove the handle from the tap.
4. Unscrew the top assembly from the body.
5. Check the o-ring on the spindle and the
jumper valve for wear and damage.
Replace if required.
6. Clean the spindle and body of debris.
7. Place a new o-ring (if required) onto the
spindle and re-grease with potable water
approved grease.
8. Re-assemble top assembly. Follow the product
installation guidelines for the relevant product
to re-assembly method.
WARRANTY
The warranty set forth herein is given expressly and is the only warranty given by the Galvin Engineering
Pty Ltd. With respect to the product, Galvin Engineering Pty Ltd makes no other warranties, express or
implied. Galvin Engineering Pty. Ltd. hereby specifically disclaims all other warranties, express or implied,
including but not limited to the implied warranties of merchantability and fitness for a particular purpose.
Galvin Engineering Pty Ltd products are covered under our manufacturer's warranty available for download
from www.galvinengineering.com.au Galvin Engineering Pty Ltd expressly warrants that the product is free
from operational defects in workmanship and materials for the warranty period as shown on the schedule
in the manufacturer's warranty. During the warranty period, Galvin Engineering will replace or repair any
defective products manufactured by Galvin Engineering without charge, so long as the terms of the
Manufacturer's warranty are complied with.
The remedy described in the first paragraph of this warranty shall constitute the sole and exclusive remedy
for breach of warranty, and Galvin Engineering Pty Ltd shall not be responsible for any incidental, special
or consequential damages, including without limitation, lost profits or the cost of repairing or replacing other
property which is damaged if this product does not work properly, other costs resulting from labour charges,
delays, vandalism, negligence, fouling caused by foreign material, damage from adverse water conditions,
chemical, electrical or any other circumstances over which Galvin Engineering has no control. This warranty
shall be invalidated by any abuse, misuse, misapplication, improper installation or improper maintenance
or alteration of the product.
Version 2, 12 July 2022, Page 5 of 5
CERAMIC DISC TAPWARE
1. Turn off the water supply and turn on the tap
handle to drain water from the bodies.
2. Remove the temperature indicator from the
handle.
3. Remove the handle from the tap.
4. Unscrew the ceramic head part from the
body.
5. Check the o-ring on the ceramic head part
for wear and damage. Replace if required.
6. Clean the head part and the body of any
debris.
7. Replace the cartridge and hand tighten back
into the body.
8. Follow the product installation guidelines for
the relevant product to re-assemble.
Document No.: 001.00.10.08
Version 1, 12 July 2022, Page 5 of 5