Coram Showers OFFSET QUADRANT Manuel - Sayfa 6
Banyo Armatürleri Coram Showers OFFSET QUADRANT için çevrimiçi göz atın veya pdf Manuel indirin. Coram Showers OFFSET QUADRANT 8 sayfaları.
Ayrıca Coram Showers OFFSET QUADRANT için: Hızlı Başlangıç Kılavuzu (9 sayfalar)
11
It is advised that this stage is carried out by two people to avoid damaging the runners, rails or doors.
a: From inside the enclosure, hang the top 'door rollers' onto the top rail 'runner'.
b: From outside (with the door closed) depress both 'plungers' on the bottom 'door rollers' and position under the bottom rail
'runner' and release the 'plungers'.
12
The 'wheels' at the top of the doors may need adjusting so that the doors slide freely and the magnetic seals meet evenly when
the doors are closed.
From outside the enclosure, turn the adjuster screw (under each of the top wheels) as shown until the doors hang vertically.
6
From inside
From inside
a
b
Ensure doors are adjusted
so the bottom wheels are
engaged in the bottom rail and
they are under light tension but
still free to run.
Plunger
From
outside