AFL Hyperscale 10014768 Kurulum Kılavuzu - Sayfa 6

Bilgisayar Donanımı AFL Hyperscale 10014768 için çevrimiçi göz atın veya pdf Kurulum Kılavuzu indirin. AFL Hyperscale 10014768 16 sayfaları. Poc backboard

Installation Process

Cut the ducts to length and push duct into teeth
2
and secure with cable tie. Push on blowing
indicator (not supplied).
4
Install 24f cable – minimum overlength 3m from
gas block (Ø3mm blowing cable only).
6
© AFL Hyperscale. All rights reserved
3
Use tie-off positions for network duct/cable.
Secure using hose clip.
5
24f cable looped inside the raceway.