Jacuzzi 27842.01 Kurulum ve Kullanım Kılavuzu - Sayfa 8
Yüzme Havuzu Filtresi Jacuzzi 27842.01 için çevrimiçi göz atın veya pdf Kurulum ve Kullanım Kılavuzu indirin. Jacuzzi 27842.01 18 sayfaları. Domestic chlorine generating device

Section 2b – INSTALLATION
Electrical Connections
Jacuzzi recommends that a licensed electrician or certified electrical contractor perform the electrical connections.
DANGER: ensure that the electrical panel or filter pump circuit breaker is turned OFF before wiring this unit.
Your Commander II Model JC5 Control Box comes pre-wired from the factory for 230VAC (1.5 amps max draw) and can also
operate on 115 VAC, (3.0 amps max draw) at 50/60Hz. 1.8m (6ft.) of AC lead wires are provided with the unit and are located on the
bottom base plate of the control box along with the Cell, Tri-Sensor and optional ORP Interface connections.
Converting to 115VAC is accomplished by accessing the circuit board, rewiring, and attaching the included jumper as shown below.
Remove the cover (see page 10) to access and ensure that the Jumper Connections on the circuit board marked "TRANSFORMER
PRIMARY" are matched to the LINE IN voltage. Follow all state/local codes for electrical installations.
►An additional jumper is
provided with your
Installation Kit for 115VAC.
Location of the
Input Jumper Connections
Top terminals factory wired – do not disturb.
AC to PCB
#1
#2 #3 #4 #5 #6
Ground
Lugs
(Gr/Yel) (Br) (Bl)
Commander AC Line IN
AC LINE IN (Wiring diagram also located on inside of cover):
For 230 VAC; Brown (Br) = Line 1, Blue (Bl) = Line 2, Green w/Yellow Tracer (Gr/Yel) = Earth Ground
For 115 VAC; Brown (Br) = Line, Blue (Bl) = Neutral, Green w/Yellow tracer (Gr/Yel) = Earth Ground
The AC Line IN wiring is pre-set for connection to the LINE SIDE of your time clock, electronic controller switch or relay to work
in conjunction with your circulation pump.
. Each Cell Cord contains (2) Banana Plugs that attach to the (2) Banana Jacks on the bottom of the Control Box.
Cell Cord
Polarity does not matter. The other end of the cell cord has a three-position plug that connects to the cell in any direction. See page
11 for service instructions.
. The Tri-Sensor Cord connects to the keyed 6-pin harness on the Control Box Base Plate. The opposite end of
Tri-Sensor Cord
the cord connects to the Tri-Sensor Assembly with a locking ring quick connect. Align the groove and keyway on the connector and
twist the locking ring to ensure a proper connection. Refer to the instructions on pages 10 & 12 for diagrams and additional
instructions.
. When an ORP Chemical Controller is interfaced to your Commander II Model JC5, the Chemical Controller
ORP Connection
will remotely control the SANITIZER Output. Adjust the output level to 0% and connect the ORP controller to the 2-pin connector
on the Control Box Base Plate. When the ORP is activated, the output will indicate ON with the display showing 0%.
WARNING: THE ORP CONNECTIONS ARE DRY CONTACT INPUTS, DO NOT ENERGIZE THESE
INPUTS! DAMAGE TO THE CONTROL BOX WILL OCCUR AND WILL VOID THE WARRANTY.
Control Box Connections
Power Circuit Board
Transformer
INNER CONTROL PANEL
Bonding
Lug
Conduit
connector
provided
TAB 10
TAB 9
TAB 8
TAB 7
230VAC
TAB 6
TAB 5
TAB 4
TAB 3
TRANSFORMER PRIMARY
230 VAC
FACTORY SETTING
Plug
AC
Plug
Line In
2-pin ORP
Connector
CONTROL BOX BASE PLATE
5
TAB 10
TAB 9
TAB 8
115VAC
TAB 7
TAB 6
TAB 5
115VAC
TAB 4
TAB 3
TRANSFORMER PRIMARY
115 VAC
WIRING DIAGRAM
6-pin Tri-sensor
connector
Cell Cord
Connectors