Game ready ATX C-T Spine Manuel
Tıbbi Ekipman Game ready ATX C-T Spine için çevrimiçi göz atın veya pdf Manuel indirin. Game ready ATX C-T Spine 4 sayfaları.
D
C
Application
1.
Slide one arm through the Wrap.
2.
Slide the other arm through the other side of Wrap.
3.
Take hold of the shoulder wings (A) and pull the Wrap down
gently to ensure good contact with the back of the neck.
4.
Fasten the hook and loop closure at the center of the chest.
5.
Adjust the two side straps (B & C) equally on both sides of
the body.
5a. Elastic extension bands (E) on each side of the chest straps
allow the Wrap to accommodate various body sizes.
Unfasten the side straps; detach the elastic strap on the
inside and reattach the loop towards the back of the Wrap.
Repeat for the other side.
6.
Adjust the two shoulder straps (A & C) by completely un-
hooking and reapplying them over the chest and shoulders
– Take care to keep Connector (F) unobstructed.
• There is an insulation flap (D) at the top of the neck collar. If
the collar fits below your ears, flip the insulation flap outward
extending the cooling area. If the collar covers your ears, keep
the insulation flap tucked inside the Wrap.
• After fitting the Wrap properly, you should not have to
readjust the chest straps for subsequent treatments. Unhook
the closure at the center of the chest and remove the Wrap.
To reapply, slide the Wrap on like a vest and fasten the hook
closure at the center of the chest.
1
A
F
B
3
E
English
5
C-T Spine
1
2
4
5a
6