Agua ACHILLE-LI Manuel - Sayfa 7

Banyo Armatürleri Agua ACHILLE-LI için çevrimiçi göz atın veya pdf Manuel indirin. Agua ACHILLE-LI 9 sayfaları. Shower base

5

TESTING THE DRAINAGE.

5A.
the base with a small amount of water.
U
n
e
o f
s i
que la connexion du drain ait été complétée,
bouchez le drain et remplisez la base avec une petit
quantité d'eau.
5B.
Check for any leakage around the drain (some bub-
bles may appear) and below (if you have access to).
bulles pourraient apparaître) ou à tout autre endroit
5C.
Unplug the drain and assure that the drainage is ef-
There must be no puddle of water accumula-
tion in the base.
la base se fasse correctement.
6
SECURING THE BASE.
6A.
Fasten base to studs using #6 x 1 3/8"
screws (preferably stainless steel screws)
F
x i
e
z
a l
b
a
s
e
a
u
x
m
V
INSTALLATION
Acrylic Shower Base
/

TESTEZ LE DRAINAGE.

.
/

FIXEZ LA BASE.

o
n
a t
n
s t
d
e
m
r u
a
v
e
c
d
e
s
5A
If water doesn't drain properly even though the base is lev-
eled, do not continue this installation.
Please remove the base and return it to your dealer for
exchange.
V
Shim if necessary
6A
7