Bristan CR SHXDIVFF C Kurulum Talimatları ve Kullanım Kılavuzu

Sıhhi Tesisat Ürünleri Bristan CR SHXDIVFF C için çevrimiçi göz atın veya pdf Kurulum Talimatları ve Kullanım Kılavuzu indirin. Bristan CR SHXDIVFF C 2 sayfaları.
Ayrıca Bristan CR SHXDIVFF C için: Kurulum Talimatları ve Kullanım Kılavuzu (2 sayfalar), Kurulum Talimatları ve Kullanım Kılavuzu (2 sayfalar), Kurulum Talimatları ve Kullanım Kılavuzu (2 sayfalar)

Bristan CR SHXDIVFF C Kurulum Talimatları ve Kullanım Kılavuzu
Specifications
Cold Water Supply
Working Pressures
Max: 5.0 bar
Min: 0.2 bar
3.0
2.0
3.0
2.0
4.0
1.0
1.0
4.0
Min: 5°C Max: 25°C
0.2
5.0
0.2
5.0
Pressure
Pressure
BAR
BAR
Factory pre-set
Maximum Static Pressure: 10.0 bar
42°C
Tools You'll need
Pencil
Flat head Screwdriver
Drill
Cross head Screwdriver
Prior to Installation
All products manufactured and supplied by Bristan are safe to use provided that
they are installed, operated and receive regular maintenance in
accordance with these instructions.
This product needs to be installed in accordance with, and meet the
requirements of the Water Supply (Water Fittings) Regulations 1999 and
current by-laws. For full Installation Requirements & Notes (IRN) please
visit wras.co.uk/directory.
Isolation valves must be fitted to the inlet water supplies to ensure ease of future
maintenance.
Before installing this product the water supply must be thoroughly flushed in
order to remove any swarf, solder etc.
This product must not be modified in any way as this will invalidate the
guarantee.
Full access must be made available for future maintenance/servicing purposes.
Before drilling into walls, check that there are no hidden electrical wires,
cables or water supply pipes. This can be checked with the aid of an
electronic detector.
If power tools are used do not forget to:
- Wear eye protection
- Unplug equipment after use
If in doubt, contact a registered plumber or your Local Water Authority or
the Secretary of the Institute of Plumbing, address as follows:-
The Institute of Plumbing,
64 Station Lane,
Hornchurch,
Essex,
RM12 6NB, Tel: 01708 472791
Installation Instructions
& User Guide
Please leave these instructions
with the end user
Product Code: CR SHXDIVFF C (D6)
Inlet Water Temperature
Inlet Dimensions
Hot Water Supply
65°C
25°C
60°C
5°C
60-65°C Recommended
IMPORTANT
The inlet hot water must
be at least 10°C above the
required blend temperature.
Spanner
Pipe Cutter
Hexagonal Keys
Pack Contents
x2
x1
x2
x2
x1
x1
x1
Installation
1
Identify the
required positition of
the valve and prepare
the water supply pipes.
Supply pipes should be
150mm apart.
Using the backplate
150mm
supplied with the
wallmount, mark and
Centres
drill holes.
3
Inlet Connections
15mm
Compression
Secure the isolator
Secure the isolator
onto the backplate
onto the backplate
ensuring the olive is
ensuring the olive is
positioned over the
positioned over the
pipework correctly.
pipework correctly.
Isolation
Socket Spanner
1
x1
Remove the concealing
Remove the concealing
cap from the shroud.
cap from the shroud.
Operation
x1
Fixed Head
Fixed Head
x1
2
Secure the rubber backplate
Secure the rubber backplate
and backplate into place.
and backplate into place.
4
5
Push shrouds to the
Push shrouds to the
back of the wall outlet,
back of the wall outlet,
securing them against
securing them against
the rubber fixing plate
the rubber fixing plate
2
Cold
Cold
Hot
Hot
Handset
Handset
Secure the shower to
Secure the shower to
the wall mount.
the wall mount.
Rotate the shroud until
Rotate the shroud until
the opening aligns with
the opening aligns with
the isolation screw.
the isolation screw.
Turn the screw to isolate
Turn the screw to isolate
the water. Reverse the
the water. Reverse the
process when turning
process when turning
the water back on.
the water back on.