Majestic fireplaces FireStage UVSRC36A Ev Sahibinin Kurulum ve Kullanım Kılavuzu - Sayfa 5
Kapalı Şömine Majestic fireplaces FireStage UVSRC36A için çevrimiçi göz atın veya pdf Ev Sahibinin Kurulum ve Kullanım Kılavuzu indirin. Majestic fireplaces FireStage UVSRC36A 16 sayfaları. Vent-free firebox
Ayrıca Majestic fireplaces FireStage UVSRC36A için: Broşür ve Teknik Özellikler (6 sayfalar), Ev Sahibinin Kurulum ve Kullanım Kılavuzu (12 sayfalar)
3a
5" Min.
Combustible Per-
pendicular Wall
3b
Clearances
without Canopy
Noncombustible
Material
9¹⁄₂"
Min.
Fireplace
Opening
Fig. 3 Clearances to combustibles.
To install the optional canopy, remove the four
(4) screws supplied with a Phillips screwdriver.
Two (2) screws are located across the top of the
fireplace opening approximately 5" to the right
FP604a
and left from center. Two (2) screws are located
clearances
4" down from the top on each side of the fireplace
2/04
opening. Place the canopy, making sure the 1/4"
hex head screws across the top of the opening
align with the clearance holes in the canopy. Se-
cure with the four (4) previously removed screws.
WARNING: The firebox canopy must not be modi-
fied or replaced with a canopy that may be pro-
vided with the unvented decorative room heater.
4. Floor Clearances: No clearance is required if the
appliance is installed per these instructions.
Installing the Firebox
This list of specific instructions will help you make cer-
tain that every installation operation is done correctly.
Complete the installation steps in the sequence shown.
LOCAL BUILDING CODES SHOULD BE CONSULTED
IN ALL CASES AS TO THE PARTICULAR REQUIRE-
MENTS CONCERNING THE INSTALLATION OF FAC-
TORY BUILT FIREPLACES.
Select the location for the fireplace by taking into con-
sideration the factors previously outlined in the Choos-
ing the Location section of the manual.
20007435
3c
Clearance to Combustible Mantel
Projections without Canopy
42"
10"
24"
Min.
FP604a
24
22
20
18
16
14
12
10
8
2
4
6
8
10
Mantel (Combustible)
Projections (")
T225
mantel clearance
2/04
Step 1: Framing the Firebox
The width of the framed opening must be 39¹⁄₄" for
UVSRC36A or 45¹⁄₄" for UVSRC42A. (Fig. 4)
The entire fireplace can be elevated above the floor
to achieve a raised hearth effect. This can be done by
adding a small platform to achieve the desired height.
NOTE: See pre-wiring of Junction Box and Electrical
Services on Page 7.
Step 2: Install the Firebox
Install the firebox into the framed opening by setting
it directly in front of the opening and sliding it into the
proper position.
Step 3: Level the Firebox
Check the level of the firebox on the top edge of the fire-
place face. Shim if necessary.
Step 4: Secure the Firebox
Four (4) nailing flanges are supplied with the fireplace
(found on the fireplace hearth). To level the box and
secure it firmly in place, remove the nailing flanges from
the hearth and install at the sides of the fireplace as
shown in Figure 5.
NOTE: The nailing flanges have two (2) sets of holes
to allow for adjustment for 1/2" or 5/8" offset of the face
of the unit. When installing the nailing flanges, choose
the set of holes on the nailing flange that fit with your
application.
UVSRCA Vent-Free Fireboxes
3d
Clearance to Combustible Mantel
Projections with 4" Canopy
22
20
18
16
14
12
10
8
6
2
4
6
Mantel (Combustible)
Projections (")
*Combustible projections above
the fireplace must be within the
area described by the dashed line.
8
10
T225
5