Centrometal Bio-Tec 25 Teknik Kılavuz - Sayfa 7
Kazan Centrometal Bio-Tec 25 için çevrimiçi göz atın veya pdf Teknik Kılavuz indirin. Centrometal Bio-Tec 25 17 sayfaları.
![Centrometal Bio-Tec 25 Teknik Kılavuz](/uploads/products/server2/2045392/2045392.jpg)
- 1. Technical Data
- 2. Delivery Package
- 3. Additional Equipment
- 4. Cleaning and Maintenance of the Boiler
- 5. Connection to the Chimney
- 6. Boiler Use
- 7. Connection to the Central Heating System
- 8. Boiler Start up
- 9. Boiler Thermal Protection
- 10. Thermal Fuse
- 11. Electric Connection
- 12. Boiler Regulation
Cleaning and mainternance of the boiler
11.0. CLEANING AND MAINTENANCE OF THE BOILER
Protective gloves must be used (see Image 9). Ash remaining in boiler after solid
fuel firing should be disposed into metal containers with a cover.
wood gasification principle the fuel burns out totally, the cleaning of the boiler is
limited to the upper and lower combusting chamber once in a week and the cleaning
of flue gas tubes (DC - page 3) on the back side of the boiler is necessary only after
the heating season, i.e. min. once in one heating season.
and fan box has to be performed when necessary.
Before each starting of the boiler
to shake the flue gas tube cleaning lever few times (Image 11 - ZP).
Cleaning of lower and upper part of the combustion chamber:
- to be performed by a poker delivered with the boiler.
- it is necessary to take care, at cleaning the lower combustion chamber, to clean
latteral sides of the lower combustion chamber well, in order to provide as better
heat exchange and maximum boiler efficiency, as possible (Image 11,-BL).
Cleaning of fan blades (Image 8.-VP):
- unscrew four M8 nuts by which the fan flange is fixed to the boiler (Image 11).
- pull out the fan (Image 11.-VT) with the flange along the flange holder
(Image11.-NV) and turn it to the left to access the fan blade (Image 11.-VP).
- then, remove all deposits of ash and impurities from the blade.
- put the fan together with the flange back on four M8 screws and tighten them
with four M8 nuts to get good air tightness during operation.
Cleaning of the fan box (Image 11.-KV):
- unscrew two M8 nuts and remove the fan box lid with gasket (Image 11.-VD).
- remove ash and impurities from the fan box.
- place back the fan box lid (Image 11.-VD) with gasket on two M8 screws and
tighten them with two M8 nuts to get good air tightness during operation.
26
As through the
Cleaning the fan blade VP
(press button ''START''
) it is reccomended
Technical manual Bio-Tec
2.1. INSTALLATION OF MOVING PARTS
Bio-Tec movable parts are delivered packed as a set within the top boiler chamber.
After the boiler is placed in the boiler room, installation of movable parts is carried
out (page 3, DO- two lids of bottom openings of the flue gas chamber and ZP-lever
for cleaning of flue gas tubes). The lid of bottom openings of the flue gas chamber
has to be fixed by two screws to the boiler body to achieve good tightness to prevent
air penetration during boiler operation (see Image 2). The flue gas tube cleaning
lever can be installed either on the left or on the right boiler side with screws M8 onto
the prepared holder (page 3).
Image 2.
Mounting of lower opening covers for flue gas chamber cleaning
Lateral openings
for cleaning the
flue gas chamber
Detail A:
DO
Technical manual Bio-Tec
Installation of moving parts
A
Bio-Tec 25
Bio-Tec
35/45
Covers (DO) of the the lower
openings the flue gas chaber adjust
on to foresee place (detail A).
For the proper operation of the
boiler it is IMPORTANT to hard
tighten the doors how it to seal
perfectly !!
(DO)
7