ADF ADH100ID Ek Talimatlar - Sayfa 16

Kapalı Şömine ADF ADH100ID için çevrimiçi göz atın veya pdf Ek Talimatlar indirin. ADF ADH100ID 17 sayfaları. Double sided inbuilt heater zero clearance box

ADF ADH100ID Ek Talimatlar
ADF 1000 NMV LINEA ZERO CLEARANCE BOX ASSEMBLY INSTRUCTIONS
1/11/19
Step 8:

Fitting the FLue

The flue is raised off the top of the
ZCB and the heater using these 2
brackets, orientated like below.
The bottom of the bracket gets
inserted into the ZCB.
The brackets are fixed to the
10" inner casing and then the
upper folded U shaped hook is
fixed to the 12" outer casing.
These can be fixed with self
tapping screws or rivets.
The 10" slides through the top of the Zero Clearance Box and sits above the
heater resting on the brackets. The 10" MUST be sealed with a flexible sealant
around the top of the Zero Clearance box to stop heater air coming into the
chimney chase cavity.
12" MUST sit 70mm above the ZCB as shown below.
16