Gamma Progression Els Kullanıcı El Kitabı - Sayfa 5

Tel Çekme Makineleri Gamma Progression Els için çevrimiçi göz atın veya pdf Kullanıcı El Kitabı indirin. Gamma Progression Els 20 sayfaları.
Ayrıca Gamma Progression Els için: Kullanıcı El Kitabı (20 sayfalar), Kullanıcı El Kitabı (19 sayfalar)

Gamma Progression Els Kullanıcı El Kitabı
POWER CONNECTION & CONTROLS
A
A
B
Instructions for Power Connection and Controls
CAUTION ! Before connecting to the power supply, check the voltage source that the
machine is being connected to. The acceptable range of input voltages for this ma-
chine is between 100 V and 240 V @ 50 to 60 Hz. If you have any questions regarding
the input voltage supply for your area, please ask your electric utility company.
To install the power cord, insert the female end of the power cord into the AC Adapter and
then insert the female end of the cord from the AC Adapter into the A/C Power Cord Socket
"C" located on the back panel of the tensioner. Plug the male end of the power cord into a
grounded power outlet. When using extension cords, use grounded heavy duty extension
cords rated for 15 AMP service.
To connect the foot pedal switch, insert the male pin at the end of the foot pedal switch cord
into the Foot Pedal Switch Receptacle "B" located on the back panel of the tensioner.
Switch on the machine by pressing the Lighted On-Off Power Switch on the back panel. At
start-up, the LED will display a countdown from "9.0" to "0.0" while the machine performs a
self diagnostics check at start-up.
WARNING!
NEVER OPEN UNIT WITH POWER CONNECTED.
CHILDREN SHOULD NEVER BE PERMITTED TO OPER-
ATE THIS MACHINE WITHOUT ADULT SUPERVISION.
B
C
D
C
FOR INDOOR USE ONLY.
5
Front Panel Features
A - String Gripper
B - Tension Switch
C - LED Tension Display
Back Panel Features
A -
Lighted Power Switch
B -
Foot Pedal Switch Receptacle
C -
A/C Power Cord Socket
D -
String Length Meter (currently not
available)