Centurion R3R5 Hızlı Kurulum Kılavuzu - Sayfa 11

Kapı Açıcı Centurion R3R5 için çevrimiçi göz atın veya pdf Hızlı Kurulum Kılavuzu indirin. Centurion R3R5 17 sayfaları. Rotary swing gate operator

1.
220V AC mains cable (3 core LNE
2
0,5mm )*†, via mains isolator switch
Or
Low voltage 16V AC battery charger
supply (2 core 1,5mm )†.
2.
Intercom cable (n1 + 6 core) to
house.
3.
Slave motor cable (if required) (3
2
core 2,5mm + 3 core 0,5mm
multistranded).
n1 = number of cores required by intercom.
* Increase cable thickness if pillar lights are to be installed.
† Screened cable is always recommended to provide better protection against lightning - earth one end
of screening.
2
S
ET UP THE
Release the manual override and close the gate(s).
Use the origin tool and line up marks as in figure 10. (IM page 28)
Open gate ½ way and unscrew the manual release mechanism.
(IM page 28).
S
ETTING THE
Figure 10 Origin Setup
CABLE REQUIREMENTS
2
2
G
G
O
ATE
Setup Tool
Manual Release
Mechanism
4.
Radio receiver cable (3 core 0,5mm
multistranded).
5.
Pedestrian key switch (if required) (2
core 0,5mm multistranded).
6.
Infrared beams or safety edge (if
required) (3 core 0,5mm
multistranded)
7.
Intercom cable (n2+2 core 0,5mm
multistranded) to gate station.
n2 = number of cores required by intercom.
O
ATE
RIGIN
RIGIN
2
2
2
2