Gamry LPI1010 Hızlı Başlangıç Kılavuzu - Sayfa 3
Test Ekipmanları Gamry LPI1010 için çevrimiçi göz atın veya pdf Hızlı Başlangıç Kılavuzu indirin. Gamry LPI1010 5 sayfaları. Load/power supply interface high voltage eis test system
Connect Current Monitor and Current Control Cables
The LPI D-sub Module has one cable end with two BNC connectors. Connect the red-marked BNC
connector lead to the mating current control (I_CTRL) input of your power supply. Connect the second,
black-marked BNC connector to the current monitor (I_MON) output of your power supply.
Connect Voltage Sense Cables
The LPI D-sub Module is connected via a cable to onse side of the Cable End Module. On the other side,
connect both red and black Voltage Sense Cables which are supplied with your LPI1010 system to the
mating banana connectors of the Cable End Module. The red cable is assigned to the positive (+) contact
and the black cable is for the negative (-) contact.
Connect your cables to the DUT (Device Under Test).
Connect both Voltage Sense Cables to the electrode contacts of your DUT. The red connector is for the
positive lead, the black connected to the negative contact. Afterwards, connect the power supply to your
DUT. Depending on your system, the power output may vary. Use appropriate cables and adapters.