deconta C 25 L Kullanım Kılavuzu - Sayfa 7

Su Sistemi deconta C 25 L için çevrimiçi göz atın veya pdf Kullanım Kılavuzu indirin. deconta C 25 L 12 sayfaları. Water management system

Water Management Boiler system C 25 L
Before the initial operation of the waste water pump or after a long period of stagnation,
check that the shaft rotates freely when turned by hand. To this put a screwdriver in the
notch of the shaft end on the fan side and move the shaft. The strong initial rotational
resistance of the new pumps will come loose after running.
Sewage OUT
Unplug
 Establish hose connections:
o Connection „Warm water shower water" with shower top
o Connection „Sewage IN" with shower tray
o Connection „Sewage OUT" with sewage system
 Fill waste water pump with water
 Fill the tank manually via the filling port
 Connect to power supply, the water in the tank is warmed
 the unit is now ready-to-operate
Instruction manual

6 Initial operation

Shower water
Sewage IN
Seite 7