GREEN SERIES FITNESS CIR-TM7000E-G Yükseltme Prosedürü - Sayfa 19

Koşu Bandı GREEN SERIES FITNESS CIR-TM7000E-G için çevrimiçi göz atın veya pdf Yükseltme Prosedürü indirin. GREEN SERIES FITNESS CIR-TM7000E-G 20 sayfaları. Suspension upgrade procedure
Ayrıca GREEN SERIES FITNESS CIR-TM7000E-G için: Prosedür (3 sayfalar)

3.5. Using the screws removed at the beginning of the procedure; install the two (2) machine screws first at rear
of motor hood to frame.
3.6. After installing the machine screws at the front of the motor hood, install the two (2) self-tapping sheet metal
screws on each side of the motor hood.
www.GreenSeriesFitness.com
©December 2014
Call Toll free at (800) 269-7130
19