CORNING CCH-CS Hızlı Başlangıç Kılavuzu - Sayfa 9

Ağ Donanımı CORNING CCH-CS için çevrimiçi göz atın veya pdf Hızlı Başlangıç Kılavuzu indirin. CORNING CCH-CS 12 sayfaları. Splice cassette and slack cassette for closet connector housings
Ayrıca CORNING CCH-CS için: Hızlı Başlangıç Kılavuzu (11 sayfalar)

CORNING CCH-CS Hızlı Başlangıç Kılavuzu
10
Store up to 96.5 cm (38 inches) of cable slack under cassette.
5.
Splice Cassette (CCH-CS) Installation — Ribbon Fiber
5.1
Ribbon Fiber Preparation and Routing
1
Cut 23 cm (9 inches) of protective tubing.
2
1
Cut 23 cm (9 inches) of protective tubing.
TPA-3937
2
TPA-3937
STANDARD RECOMMENDED PROCEDURE 003-895 | ISSUE 4 | OCTObER 2017 | PAGE 9 OF 12
Loose Tube Fiber
CRITICAL STEP:
Slide tubing onto ribbon
up to the fan-out body.
CRITICAL STEP:
Slide tubing onto ribbon
up to the fan-out body.
Tight-buffer Fiber
Protect tight-buffer fiber with braided tubing, if
needed, for multiple cables or 24-fiber cables.
Ribbon Pigtail
Ribbon Pigtail
TPA-3950