CORNING EDC-02P-NH Manuel - Sayfa 6
Muhafaza CORNING EDC-02P-NH için çevrimiçi göz atın veya pdf Manuel indirin. CORNING EDC-02P-NH 7 sayfaları. Environmental distribution center
Ayrıca CORNING EDC-02P-NH için: Manuel (12 sayfalar)

9.2. For Buffer Tube Fan-Out Kits
EDC-02P-NH
Step 1:
route the buffer tube(s) twice
around the radius guides in a
counterclockwise direction.
Step 2:
mark the location of the
mounting bracket on the tube(s).
Step 3:
Install fan-out kit(s) and connectors.
Step 4:
re-route the buffer tube(s) around
the radius guides and secure the
fan-out bodies with a cable tie.
NOTE:
For both applications, route the connectorized
fan-out tubing around the radius control guides
and plug connectors into the appropriate
connector panel.
STANDARD RECOMMENDED PROCEDURE 003-304 | ISSUE 10 | September 2010 | PAGE 6 OF 7
EDC-06/12P-NH
Step 1:
Step 2:
Step 3:
TPA-2927
Step 4:
Step 5:
TPA-2926
remove splice tray holder bracket.
route the buffer tube(s) three
times around the radius guides in a
counterclockwise direction.
mark the location of the mounting
bracket on the tube(s).
Install fan-out kit(s) and connectors.
re-route the buffer tube(s) around
the radius guides and secure the
fan-outs with a cable tie.
TPA-2924
TPA-2925