GARDEN MASTER GM1815 Montaj Talimatları Kılavuzu - Sayfa 2
Dış Mekan Depolama GARDEN MASTER GM1815 için çevrimiçi göz atın veya pdf Montaj Talimatları Kılavuzu indirin. GARDEN MASTER GM1815 8 sayfaları. Sloping roof shed
COMPONENTS CHECKLIST
Please check the parts carefully and advise immediately if any are damaged or missing.
2
x 1830mm sheets for the back
1 / 2
A
1 x 330mm wide sheet with door
D
jamb attached
4 x 1815mm channels with ends cut for
G
front and back walls
1 x pack of rivets with padbolt for Zincalume
J
sheds, rivets for colour sheds, 2 x 'Z' door
braces and riveter for general assembly
IMPORTANT!
•
Remove the swarf (drill filings) from the panels as you assemble them.
•
All components are cut to length. Do not cut any parts unless instructed.
•
Rivets through the inside of the channels into the sheeting are just as important
as rivets from the outside.
RIBS AND PANS
•
Generally most rivets are spaced at 300mm apart.
•
Keep the rivets in the pans as close to the ribs as possible for added strength.
•
Ribs will always protrude to the outside of the shed.
•
Extra internal rivets are strongly recommended in high wind areas.
BUILDING YOUR SHED
The basic task is to join the sheets together to form your
panels, and rivet channels to the top and bottom of these
panels. They will then join together to form your shed
(diagram 1, 2 and 3).
!
2
4 x 1980mm - 1830mm sloping sheets
B
(side walls 2 left, 2 right)
Door pre-hinged to 700mm sheet with
E
door jamb
2 x 1830mm 'L's for flashing the roof to
H
the side walls
If you choose to vary from these instructions your
warranty will be impaired.
DIAGRAM 1
DIAGRAM 2
i
If you need advice, call us
or email us at [email protected]
2
x 1830mm sheets for the roof
1 / 2
C
4 x 1515mm channels for end walls
F
2 x 1815mm channels for the roof
2 x 793mm door spacers
I
Pan
DIAGRAM 3
FREE
on
0800 807 433
Rib