Alien green Mostat Kurulum Kılavuzu için Talimatlar - Sayfa 10

Termostat Alien green Mostat için çevrimiçi göz atın veya pdf Kurulum Kılavuzu için Talimatlar indirin. Alien green Mostat 15 sayfaları.

DESCRIPTION OF PROCESS CONTROL BLOCK (PCB)
The red light of power indicator is on when the process control block (PCB) is supplied with voltage power.
The green light of
Status
The green light of
AP-Status
The green light of
Status
The green light of
AP-Status
The green light of boiler indicator is ON when the heating is ON.
The green light of boiler indicator is OFF when the heating is OFF.
is blinking when the factory reset, i.e. configuration option is active.
is blinking when the device is connecting to Wi-Fi router.
is on when the process control block (PCB) is active.
is on when the process control block (PCB) is connected to the Wi-Fi router.
TA1
Green Light
of Boiler Indicator
Red Light
of Power Indicator
Button
AP Status
Green
Lights
Status
09