Fujitsu ETERNUS AF250 S2 Saha Planlama Kılavuzu - Sayfa 27

Depolama Fujitsu ETERNUS AF250 S2 için çevrimiçi göz atın veya pdf Saha Planlama Kılavuzu indirin. Fujitsu ETERNUS AF250 S2 38 sayfaları. Hybrid storage systems, all-flash arrays, power synchronized unit
Ayrıca Fujitsu ETERNUS AF250 S2 için: Yapılandırma Kılavuzu (18 sayfalar), Güvenlik Önlemleri (12 sayfalar)

Fujitsu ETERNUS AF250 S2 Saha Planlama Kılavuzu
1.
ETERNUS AF Installation
Outlet/Socket Specifications
When power cords are connected to a single power supply line, the connections are more secure if each power
cord is connected to a different circuit breaker.
CP
Line 0
p To power supply facility
ETERNUS AF
Drive enclosure
Controller
enclosure
CP
CP
CP
CP
Power distribution unit
CP
Distribution
board
p To power supply facility
FUJITSU Storage ETERNUS AF250 S2, ETERNUS AF250 All-Flash Arrays Site Planning Guide
Copyright 2021 FUJITSU LIMITED
CP
CP
CP
Line 1
CP
Distribution
board
27
P3AG-1812-06ENZ0