Kohler VEIL HT200 PNE IWT Kurulum Talimatları Kılavuzu - Sayfa 4

Sıhhi Tesisat Ürünleri Kohler VEIL HT200 PNE IWT için çevrimiçi göz atın veya pdf Kurulum Talimatları Kılavuzu indirin. Kohler VEIL HT200 PNE IWT 30 sayfaları. Wall-hung toilet

INSTALLATION

1. Install Flushing Mechanism
1-1. Install The Tank
·
Turn the water supply off before installing the new toilet.
·
Install the concealed tank system in wall before
decorating the wall.
·
Install the tank system per tank's installation instructions.
Note:
Refer to installation instructions of in-wall tank for SKU
of faceplate.
Recommended rank dimension(Fig.#2-b)
1) Rank should support weight 400kg.
1-2. Install Manual Valve Or Sensor
·
Refer to installation instructions of manual valve or sensor
for the installation of flushing mechanism.
2. Set The Spacing Of The Bowl
After you install the tank, be careful to set the spacing of the
bowl on wall according to the dimensions as shown.
1247360-T01-G
400kg
Fig.#2-a
2-a
1.
1-1.
·
·
·
1)
400kg
400 10
320
1-2.
·
2.
Carrier Studs
Fig.#3
3
-4-
( 2-b)
180
35
135
Fig.#2-b
2-b
1
25 2
Unit: mm
: