Kohler K-1246 Kurulum Kılavuzu - Sayfa 11
Banyo Armatürleri Kohler K-1246 için çevrimiçi göz atın veya pdf Kurulum Kılavuzu indirin. Kohler K-1246 44 sayfaları. Bath whirlpool
Ayrıca Kohler K-1246 için: Ev Sahibi El Kitabı (32 sayfalar), Kaba İnşaat Kılavuzu (4 sayfalar), Kurulum Kılavuzu (48 sayfalar), Kaba İnşaat Kılavuzu (4 sayfalar), Kurulum Kılavuzu (48 sayfalar)
Turn the jet trim ring
clockwise to
decrease the flow.
Turn the jet trim ring counterclockwise
to increase the flow.
9. Test Run the Whirlpool
Check all electrical connections, and make sure the electrical power to the whirlpool and heater (if
equipped) is on.
Make sure all union connections to the pump and heater are securely hand tightened.
Verify that the pump banding straps have been cut (if applicable), and that the pump is resting
directly on the subfloor or whirlpool base.
Fill the whirlpool to a level at least 2" (5.1 cm) above the top of the highest jet.
Operate the whirlpool for 5 minutes, and check all whirlpool piping connections for leaks.
For additional information on whirlpool operation, refer to "Confirm Proper Operation".
Kohler Co.
Fill with water 2" (5.1 cm)
above the highest jet.
Position the jet
nozzles to direct
the water flow as
desired.
Press the air actuator to turn
on and off the whirlpool.
11
1010914-2-D