INSTALLATION
1) Install the drain in the sub-floor & position it accordingly to allow for the waste to be
connected. The self-sealing trap with flexible waste pipe (80144A-NA) is recommended,
where there is no underfloor access. Please adhere to the relevant sections of AS/NZS
3500 plumbing standard.
2) Raise the Free Standing bath off the floor by propping it up onto timber blocks
positioned at either end of the bath. Install and connect the waste outlet. Apply silicone
sealant around the waste connections to ensure a water-tight fit.
3) Connect the waste outlet to the drain. Check to see that all connections are firmly
tightened.
4) Close-off the waste and fill the bath with water, allow the water to stand for at least 30
minutes, check for leaks. Attend to waste and pipe connections as necessary.