Kohler K-11344 Kurulum Kılavuzu - Sayfa 4

Küvetler Kohler K-11344 için çevrimiçi göz atın veya pdf Kurulum Kılavuzu indirin. Kohler K-11344 25 sayfaları. Freestanding bath
Ayrıca Kohler K-11344 için: Kurulum ve Bakım Kılavuzu (45 sayfalar), Kurulum ve Bakım Kılavuzu (28 sayfalar), Kaba İnşaat Kılavuzu (4 sayfalar)

Kohler K-11344 Kurulum Kılavuzu
2. Prepare the Faucet and Drain Site
CAUTION: Risk of product damage. Do not kink or cause damage to the cable on the bath drain
during installation.
IMPORTANT! The K-7219 bath drain is required for this installation.
Mark the drain location on the subfloor. Use the cut-out template provided with the bath to assist
you.
Assemble the drain. Refer to the "Assemble the Drain" section in the installation guide packed with
the drain.
Insert the drain into the P-trap through the cutout in the floor.
Install the finished floor material on the subfloor.
Verify the distance from the top of the drain flange to the top of the finished floor is 1-1/2" (3.8 cm).
Adjust as needed to achieve this distance.
Ensure the drain is on center at the marked locations using a level. Adjust as needed.
1055344-2-A
Top of Flange
Finished Floor
4
1-1/2" (3.8 cm)
Kohler Co.