Kohler K-1139 Kurulum Kılavuzu - Sayfa 11

Küvetler Kohler K-1139 için çevrimiçi göz atın veya pdf Kurulum Kılavuzu indirin. Kohler K-1139 44 sayfaları. Bath whirlpool
Ayrıca Kohler K-1139 için: Ev Sahibi El Kitabı (32 sayfalar), Kurulum Kılavuzu (48 sayfalar), Kurulum Kılavuzu (44 sayfalar), Kurulum Kılavuzu (48 sayfalar)

Kohler K-1139 Kurulum Kılavuzu
Turn the jet trim ring
clockwise to
decrease the flow.
Turn the jet trim ring counterclockwise
to increase the flow.

9. Test Run the Whirlpool

Check all electrical connections, and make sure the electrical power to the whirlpool and heater (if
equipped) is on.
Make sure all union connections to the pump and heater are securely hand tightened.
Verify that the pump banding straps have been cut (if applicable), and that the pump is resting
directly on the subfloor or whirlpool base.
Fill the whirlpool to a level at least 2" (5.1 cm) above the top of the highest jet.
Operate the whirlpool for 5 minutes, and check all whirlpool piping connections for leaks.
For additional information on whirlpool operation, refer to "Confirm Proper Operation".
Kohler Co.
Fill with water 2" (5.1 cm)
above the highest jet.
Position the jet
nozzles to direct
the water flow as
desired.
Press the air actuator to turn
on and off the whirlpool.
11
1010914-2-D