Kohler K-1183 Kurulum Kılavuzu - Sayfa 5

Küvetler Kohler K-1183 için çevrimiçi göz atın veya pdf Kurulum Kılavuzu indirin. Kohler K-1183 25 sayfaları. Drop-in acrylic baths
Ayrıca Kohler K-1183 için: Kurulum ve Bakım Kılavuzu (29 sayfalar), Kurulum ve Bakım Kılavuzu (25 sayfalar)

Kohler K-1183 Kurulum Kılavuzu
Spread a 2" (5.1 cm)
layer of cement or
mortar bed material.
4. Secure the Bath to the Subfloor – Models With Bath Base Only
CAUTION: Risk of product damage. Do not support the bath by the rim.
Verify the subfloor is level. Shim the bath support blocks as necessary to achieve level.
Secure the bath to the subfloor using "Option 1: Secure Using Cement or Mortar Bed" OR "Option 2:
Secure Using Construction Adhesive".
Option 1: Secure Using Cement or Mortar Bed
Spread a 2" (5.1 cm) thick layer of cement or mortar on the subfloor where the bath will be placed.
This will help secure, level and support the bath.
NOTE: Do not use gypsum cement or drywall compound for this application, as they will not provide an
acceptable, durable bond.
Position a piece of plastic drop cloth or similar material over the cement or mortar bed.
With help, carefully lift the bath into place.
Verify the bath is level.
Insert the drain tailpiece into the trap.
NOTE: An access panel will simplify future maintenance.
Remove the protective tape from the bath rim.
Apply a continuous bead of silicone sealant around the entire rim of the bath.
Option 2: Secure Using Construction Adhesive
Apply a generous amount of high-quality construction adhesive to the bath base.
With help, carefully lift the bath into place.
Verify the bath is level.
Insert the drain tailpiece into the trap.
NOTE: An access panel will simplify future maintenance.
Remove the protective tape from the bath rim.
Apply a continuous bead of silicone sealant around the entire rim of the bath.
Kohler Co.
5
Apply
construction
adhesive to
the bath base.
1023730-2-F