Kohler K-1184 Kurulum Kılavuzu - Sayfa 6

Küvetler Kohler K-1184 için çevrimiçi göz atın veya pdf Kurulum Kılavuzu indirin. Kohler K-1184 21 sayfaları. Flanged acrylic bath with integral apron
Ayrıca Kohler K-1184 için: Kurulum ve Bakım Kılavuzu (29 sayfalar), Kurulum ve Bakım Kılavuzu (25 sayfalar), Kurulum Kılavuzu (17 sayfalar)

Kohler K-1184 Kurulum Kılavuzu

6. Complete the Installation

NOTE: Models with an integral apron are designed so the finished wall material [1-1/2" (3.8 cm)
maximum] will overlap the apron columns. The finished floor material [2" (5.1 cm) maximum] should butt
up against the apron.
Carefully remove the protective tape from the bath rim.
If necessary allow for deck mounted valves and spout.
Seal the joints between the bath rim edges and the water-resistant wall material with silicone
sealant. Tape and mud the water-resistant wall material.
Install the finished wall. Seal the joints between the bath rim and the finished wall with silicone
sealant.
Install the faucet trim according to the faucet manufacturer's instructions.
Clean-Up Procedures
CAUTION: Risk of product damage. Do not allow cleaners containing petroleum distillates to remain
in contact with the surface for long periods of time.
CAUTION: Risk of product damage. Do not use abrasive cleaners, as they may scratch and dull the
bath surface. Use warm water and a liquid, non-abrasive detergent to clean the surface.
CAUTION: Risk of product damage. Do not use metal scrapers, wire brushes, or other metal tools to
remove stains, paint, plaster, or tar. Use turpentine or paint thinner to remove stains, paint, or tar. Use
a powder-type detergent on a damp cloth to provide mild abrasive action to any residual plaster.
Clean and rinse the bath completely with water immediately after applying cleaners. Rinse and dry
any overspray that lands on nearby surfaces.
1014139-2-D
Water-Resistant
Wall Material
Bath
Framing
Finished
Wall
Apply silicone
sealant to the
joint between the
bath and the
finished wall.
6
Kohler Co.