Kohler REVIVAL K-873 Kurulum Talimatları Kılavuzu - Sayfa 4
Küvetler Kohler REVIVAL K-873 için çevrimiçi göz atın veya pdf Kurulum Talimatları Kılavuzu indirin. Kohler REVIVAL K-873 8 sayfaları. 5' cast iron bath
B. SUBFLOOR PREPARATION
Check the flooring under the bath and repair it if
necessary. Make sure the subfloor is level. Seal the
subfloor to reduce the risk of water damage.
C. STUD POCKET PREPARATION
Construct a recess designed for this particular
installation. Framing is of 2x4 construction. When
constructing framing, allow for the thickness of sub and
finished wall materials.
Bath should be installed in a recess. Possible studding
arrangement is illustrated below; modifications may be
needed for other types of construction.
Recessed Installation: Suggested stud construction is
illustrated.
D. PLUMBING PREPARATION
Position plumbing according to roughing-in dimensions.
Cap the water supplies and check for leaks.
6.
BEFORE INSTALLING UNIT
A. PARTIALLY INSTALL BATH DRAIN
Install the drain to the bath according to the
manufacturer's instructions.
B. PROTECT BATH UNIT
Position a drop cloth or similar material in the bath
bottom. Be careful not to scratch the bath.
Kohler Co., Kohler WI
4
AA
114014-2-
(9537)