Kohler Escale K-23077T-CPS Kurulum Talimatları Kılavuzu - Sayfa 5
Tuvaletler Kohler Escale K-23077T-CPS için çevrimiçi göz atın veya pdf Kurulum Talimatları Kılavuzu indirin. Kohler Escale K-23077T-CPS 11 sayfaları. Floor standing toilet
Ayrıca Kohler Escale K-23077T-CPS için: Kurulum Talimatları Kılavuzu (23 sayfalar), Kurulum Talimatları Kılavuzu (28 sayfalar)
4. Adjust the distance between centerline of PVC waste pipe
and the floor (wall) to match it consistent with marked
roughing-in.
185
Installation of S trap: Fix S trap onto wall with expansion
screw and insert into the reserved drainage pipe(Fig.7).
Push the bowl to insert the drainage hole into the S trap
and also insert the water pipe into the outlet of the in-wall
tank.
5. Move the toilet to the field and make sure the bottom
profile matches marked line on the ground.
1269084-T01-D
4.
Fig.#6
6
185
50
50mm From Floor
110~130
With 12504A
-NA
S-trap(For Separate Purchase)
12504A
-NA
Fig.#7
7
5.
-5-
185
50mm
(
)
PVC
UNIT mm
7