Kohler K-3082 Kurulum Kılavuzu - Sayfa 2

İç Mekan Mobilyaları Kohler K-3082 için çevrimiçi göz atın veya pdf Kurulum Kılavuzu indirin. Kohler K-3082 29 sayfaları. Mirrored cabinet
Ayrıca Kohler K-3082 için: Kurulum Kılavuzu (36 sayfalar), Kurulum Kılavuzu (32 sayfalar), Ev Sahibi El Kitabı (16 sayfalar)

Kohler K-3082 Kurulum Kılavuzu

Recommended Tools and Materials

Square
Safety Glasses

Before You Begin

CAUTION: Risk of personal injury and product damage. Mirror cabinets are very heavy. Get assistance
when lifting the cabinet.
DANGER: Risk of electric shock. Connect only to a circuit protected by a Ground Fault Circuit Interrupter
(GFCI).
- If installing multiple Purist components (cabinet, countertop, lavatory, etc.) read all product installation
instructions before beginning. Some components should be installed before others. Refer to Homeowners Guide
for sample configurations and necessary components.
- When installing this product in an area with unfinished walls or in conjunction with other components in the
Purist suite, it is recommended bracing be installed. When installing this product in an area with a finished wall,
use the wall anchors supplied for installation.
- When installing includes braces, make sure all braces for the Purist components are installed before finishing the
wall.
- Remove the cabinet from its carton and inspect for damage.
- Confirm the shelving, mounting Z" bar and hardware are in the box. Hardware bag should contain:
(3) top clips
(2) connecting blocks
(6) polyset anchors
(6) #10 x 2" screws
(10) #10 x 1/2" screws
(15) screw dome caps
(16) shelf clips
(50) shelf plugs
- Models K 3082, K 3083, K 3089 and K 3090 do not have end caps included; a separate end cap kit for these models
is required.
- Make sure electrical power can be provided before beginning the installation. Do not control power to the cabinets
with a light switch.
- The installation must have a Class A Ground Fault Circuit Interrupter (GFCI). The GFCI protects against
line to ground shock hazard. Use 120 V, 20 A, service.
- Do not complete the finished wall until needed electrical rough in has been completed.
- Observe all local building codes.
A
1010988-2-
Masking
Measuring Tape
Tape
Drill
#2 Phillips Screwdriver
Level
2
Pencil
2x4 Lumber
Kohler Co.