Aqua Creek Ambassador Manuel - Sayfa 6
Kaldırma Sistemleri Aqua Creek Ambassador için çevrimiçi göz atın veya pdf Manuel indirin. Aqua Creek Ambassador 15 sayfaları. Reverse pool lift
Anchor Installation: Saw-Cut Retro-Fit
You Will Need:
• Concrete saw with diamond blade
• Tape measure
• 4' long straight edge or chalk line
• Sledge hammer
• Cold chisel
• Large adjustable wrench
ANCHOR INSERT (3)
FIGURE 4
ANCHOR JIG-PLATE
#10-24 NYLOCK NUT
1/4" FLAT WASHER
1/4" X 3/4" PAN-HEAD
SIDE VIEW (ASSEMBLED)
51"
FLUSH W/ DECK
2500 PSI MIN.
6"
DRILL & EPOXY INTO EXISTING
SLAB (4" MIN EMBED)
*SETBACK DIMENSIONS ARE FOR FLAT DECK APPLICATIONS.
FOR SLOPED DECKS OR OTHER FEATURES, CONTACT AQUA
CREEK BEFORE INSTALLATION.
Copyright © 2019 Aqua Creek Products All Rights Reserved
• Torpedo level
• String Line
• Concrete & concrete
fi nishing tools
• #5 rebar
1" X 4"
#10-24 X 3/4"
CAP-SCREW
1" HEX NUT (6)
Cu BONDING LUG
12"
51"
TYP
22 1/2" MIN
TO
38" MAX
8-AWG SOLID-
COPPER WIRE
(ATTACH TO
BONDING-GRID)
BONDING
LUG
LABEL
#5
POOL WALL OR
REBAR
FURTHEST
4"
OBSTRUCTION
#5 REBAR E-W (5 PCS)
FIGURE 5
NOTE: 2500PSI MINIMUM STRENGTH 6"
THICK OR MORE CONCRETE IS REQUIRED
1. Remove one nut from each anchor insert.
Place the anchor inserts through the larger hole
of the anchor jig plate. Thread the removed nuts
back onto the anchor inserts. The anchor plate should be
sandwiched between the two nuts on each anchor insert.
SEE FIGURE 4
2. Mark out a section of the pool deck that you are
removing. Plan on removing at least
4 feet 3 inches by 4 feet 3 inches.
3. Cut along your marks with a diamond blade concrete
saw.
4. Using the sledge hammer break up the concrete within
the cut area and remove the pieces.
5. Install rebar in the open area of the deck. Tie the rebar
into the existing deck if possible.
6. Set the anchor system in place. For ADA
compliance and clearance, make sure the center
of the large anchor jig plate hole is between 22.5
and 38 inches from the pool's edge.
7. Using the string line or a straight edge & level,
confi rm the top of each anchor body is level with
the FINISHED deck surface. Each anchor body can
be individually adjusted by turning the nuts with
a large wrench.
8. Bond the anchoring system according to your
local code requirements by using the bonding lug
on the anchor plate.
680.26)
9. Pour concrete and fi nish the pool deck surface.
10. Once the concrete has cured, the lift is ready
to be mounted to the anchoring system.
SEE FIGURE 5
SEE FIGURE 5
SEE FIGURE 5 (See NEC Article
Revised 6/18/19
6