Aqua Creek Products Ambassador F-PPXRD-R-04 Manuel - Sayfa 18

Kaldırma Sistemleri Aqua Creek Products Ambassador F-PPXRD-R-04 için çevrimiçi göz atın veya pdf Manuel indirin. Aqua Creek Products Ambassador F-PPXRD-R-04 18 sayfaları. Reverse pool lift

3. Physical 
3
Pool Lift Tes
A ph
hysical test o
of the lift fun
be ru
un through a
a complete c
and 
with a typica
al load weig
note
es area below
w each secti
Inspe
ection Item 
a. With all c
a
connections
weight to
o confirm th
any unus
sual operatio
b
b. Verify th
e lift was ins
pool with
hout hitting 
c
c. Rotate lif
ft at least 90
NOT
TES/RECOMM
MENDATION
Copyright © 2021 Aqua Creek Products All Rights Reserved
A
Aqua Cr
st 
nction is requ
uired when d
cycle withou
ut a load prio
ht to test th
e lifts functi
on. 
 connected, 
 operate the
e lift is funct
tioning corre
on. 
stalled corre
ectly; is the li
anything lik
e a wall, rail
0 degrees ov
ver the wate
NS 
reek Pro
oducts A
Annual
INS
doing an ann
nual inspect
or to each us
se.  The ann
ions.  Make 
comments a
and/or recom
e lift though 
a complete 
ectly.  Note 
any strange 
ift free to tra
avel in and o
out of the 
, bench, etc
.. 
r and back a
again if appli
Pool Lif
ft Safety
SPECT
TION RE
EPORT
ion.  NOTE: 
The lift shou
uld always 
ual test shou
uld be ran b
oth empty 
mmendation
ns in the 
Pass 
cycle witho
ut 
noises and 
cable 
Revised 5/27/21
y
T
Fail 
N/A
18
Page 4 of 4
4