Avlite AV-OL-60 Kurulum ve Servis Kılavuzu - Sayfa 7
GPS Avlite AV-OL-60 için çevrimiçi göz atın veya pdf Kurulum ve Servis Kılavuzu indirin. Avlite AV-OL-60 20 sayfaları. Solar obstruction light
Ayrıca Avlite AV-OL-60 için: Manuel (2 sayfalar)
Charging the Battery
New lights should be left in the sun for 1-2 days to ensure battery is charged before placing in
service. Please note, light will re-charge even when toggle switch is turned to 'OFF' position.
Preferred Installation Location
For best light performance, ensure solar modules are not covered and are in clear view of the
sky with no shadows.
Light Operation
Light is activated by ON/OFF Switch. Intensity and flash settings need to be set prior to activation.
1. Remove the marked flash adjustment bung from the base of the light and set internal toggle switch
to 'ON'.
2. The power and range settings of the light are adjusted by setting the DIP switches inside the light.
Your light is normally set to maximum range (see 'Selecting an Intensity/Power Setting' section of
this manual).
3. Set rotary switches to the required flash code (see 'Selecting a Flash Code' section of this
manual).
4. Replace flash adjustment bung.
5. A sealed vent on the base allows air transfer without moisture intake, and should not be disturbed.
6. To test place dark cover (towel or jacket) on top of light to activate sensor, light will come on within
one minute.
7. Ensure that the unit is bolted to an even, flat surface.
Light
Base
Latest products and information available at www.avlite.com
Installation
User
Replaceable
Battery
ON / OFF
Switch
7
AV-OL-60
Solar Obstruction Light
Rotary
Switch B
B
Rotary
A
Switch A
Intensity Setting