Dell Precision Workstation 350 Kurulum Kılavuzu - Sayfa 29
Dizüstü Bilgisayar Dell Precision Workstation 350 için çevrimiçi göz atın veya pdf Kurulum Kılavuzu indirin. Dell Precision Workstation 350 32 sayfaları. Dell poweredge 350 servers: supplementary guide
Ayrıca Dell Precision Workstation 350 için: Bilgi Güncellemesi (30 sayfalar)
support.dell.com
captive
fastener
Figure 1-20. Installing the Cable-Management Arm
2.
Align the free end of the cable-management arm (the end with the pin and cap-
tive thumbscrew) to the back end of the right (or left) side inner rail (as viewed
from the back) of the system.
3.
Secure the cable-management arm to the inner rail with the captive thumbscrew
(see Figure 1-20).
4.
Attach the input/output (I/O) cables to their respective expansion cards on the
back of the system.
5.
Connect the remaining cables to the system.
For details, see your system's Installation and Troubleshooting Guide and User's
Guide.
6.
Secure the cables to the cable-management arm:
a.
After connecting the cables to the system, unscrew the thumbscrews that
secure the front of the server to the front vertical rail.
b.
Slide the system forward to the fully extended position.
c.
Route the cables along the cable-management arm, allowing some additional
cable slack at the hinge positions, and secure the cables to the cable-
management arm with the Velcro straps attached to the cable-management
arm.
pin
Rack Installation Guide
1-23