Dell M3UX16 Başlangıç Kılavuzu - Sayfa 10

Sunucu Dell M3UX16 için çevrimiçi göz atın veya pdf Başlangıç Kılavuzu indirin. Dell M3UX16 32 sayfaları. Servers for sap hana

Dell M3UX16 Başlangıç Kılavuzu

Power on the server to standby

Steps
1. Request the customer to plug each PDU into the site power supply. The server is now connected to the site power supply
and is ready to be powered on to standby.
2. Request the customer to turn the site power breakers ON.
3. On each server module, check that the power status LED (A) on the Management Board Right Side (MRB) is blinking green.
Figure 7. Power status LED - front view

Check the server rear LEDs

Steps
1. Wait a few seconds.
2. Check that the switch Ethernet One Gigabit (WEO) power LED (F) is green and the activity LEDs (E) of the powered
modules are green.
3. Check that the PHY Ethernet Board (PEB) or PHY Ethernet Board SFP+ (PEBS) identification LED (A) is on.
4. Check the PEB or PEBS Ethernet link LEDs (C) are on when a cable is connected.
10
Connecting the Server