Dell PowerEdge 6300 Series Kurulum Kılavuzu - Sayfa 19

Sunucu Dell PowerEdge 6300 Series için çevrimiçi göz atın veya pdf Kurulum Kılavuzu indirin. Dell PowerEdge 6300 Series 28 sayfaları. Dell poweredge 4200 servers: installation guide

Dell PowerEdge 6300 Series Kurulum Kılavuzu
support.dell.com
To replace the 24-U rack's front and back doors, perform the following steps:
1.
Lift the front door into position, and align the hinges with the hinge insert in the
rack as shown in Figure 1-4.
2.
Slide the hinge pins into the hinge insert in the rack until the hinges lock into
position.
3.
Repeat steps 1 and 2 to install the back door.

Installing the Rubber Feet

To install the rubber feet on the system base, perform these steps:
1.
Lay the system on its left side (see Figure 1-11) on a piece of foam or cardboard
(to prevent damage to the system).
2.
Attach a rubber foot in each of the four corners on the cabinet base (the cabinet's
right side in the former rack configuration) using an 8-32 x 0.5-inch hex-head,
thread-forming screw (screws and rubber feet at provided with the kit), as shown
in Figure 1-11.

Figure 1-11. Installing the Rubber Feet

Dell PowerEdge 4x00 and 6300 Systems Tower Installation Guide
8-32 x 0.5-inch screw
rubber feet (4)
1-13