3 Day Blinds 2 1/2 Başlarken - Sayfa 4

Pencere Panjurları 3 Day Blinds 2 1/2 için çevrimiçi göz atın veya pdf Başlarken indirin. 3 Day Blinds 2 1/2 8 sayfaları.

VALANCE RETURN ASSEMBLY
If you did not order valance returns for your valance, proceed
to "Valance Clip Installation".
CAUTION: Do not get the glue on the painted/stained surface
of the valance. Avoid contact with skin.
• Repeat this procedure for the other end of the valance.
• Allow the glue to dry for at least 10 minutes before
installing the valance.
Proceed to "Valance Clip Installation".
4
| 2 & 2
/
" Wood & Faux Wood & Angled Slat Blinds
1
2
• Slide a valance return
clip onto each end of the
valance.
• Apply a thin coat of glue
to the mitered end of both
the valance and valance
returns.
• Slide the valance return
clip into the valance,
joining the ends of the
valance returns with the
valance by pressing the
mitered edges together
firmly for 60 seconds.
VALANCE CLIP INSTALLATION
If you ordered a blind with a valance, you will need to install
the valance clips to the front of the headrail before installing
the blind. The valance clips should be spaced equidistant
from the end brackets and each other to allow proper
support for the entire valance. Make sure the valance clips do
not interfere with any moving parts.
Back
Front
• Snap the front of the valance clip into the groove on the
back of the valance and rotate 90°.
• Clip the back of the valance clip onto the headrail, matching
the placement of the clips on the valance.
Proceed to "Blind Installation"
• There are two parts to
the valance clip, the front
which attaches to the
valance and the back
which attaches to the
headrail.