3 Day Blinds Cornice Box Kurulum Talimatları Kılavuzu

Pencere Panjurları 3 Day Blinds Cornice Box için çevrimiçi göz atın veya pdf Kurulum Talimatları Kılavuzu indirin. 3 Day Blinds Cornice Box 2 sayfaları.

coRNIcE box
INSTALLATION INSTRUCTIONS
GETTING STARTED
A fEW SImplE ToolS ARE REquIRED
Steel Tape Measure
Power Drill and
Phillips Screwdriver
Drill Bits
Included in your order is all the hardware necessary for a normal
installation. Depending on the mounting surface, fasteners
other than the screws provided may be required. Wallboard
and plaster require the use of anchors such as expansion or
toggle bolts. Bricks, tile or stone need special plugs and drill
bits. Wood should always be pre-drilled to avoid splitting.
Professional installation is also available in most areas, call
800-800-3329.
STANDARD HARDWARE
Screw
A
Mounting Bracket A
for 1
1
/
" to 2"
4
Cornice Depth
Pencil
Level
Awl (Or Tool For Starting
A Screw Hole)
Wing Nut and Bolt
b
Mounting Bracket b
for 3" to 6"
Cornice Depth
bRAckET INfoRmATIoN
This cornice box was shippped with the proper number of
mounting brackets as shown in the following chart:
coRNIcE WIDTH
10" - 24"
24
/
" - 48"
1
8
48
/
" - 60"
1
8
60
/
" and up
1
8
ouTSIDE mouNT
If you ordered an outside mount window covering with your
outside mount cornice box, install the blind first. Once the blind
is installed you may want remove it from the brackets and set
it aside while installing the cornice box.
Each bracket must firmly support the weight of the cornice.
Mounting into wood studs is preferred. When this is not possible
(e.g. mounting into sheetrock without wood studs, mounting
into material such as stone or brick), alternative hardware (not
included) should be used.
• Hold the cornice up to the desired mounting position. The
top of the cornice's dust cover must be at least 2
top of the window casing. Mark the wall along the top of the
dust cover.
Minimum 2
/
"
1
8
mouNTING bRAckETS
2
3
4
5
/
" from the
1
8