Dell EMC PowerSwitch S5148F-ON Kurulum Kılavuzu - Sayfa 19
Anahtar Dell EMC PowerSwitch S5148F-ON için çevrimiçi göz atın veya pdf Kurulum Kılavuzu indirin. Dell EMC PowerSwitch S5148F-ON 45 sayfaları.
Ayrıca Dell EMC PowerSwitch S5148F-ON için: Kurulum Kılavuzu (20 sayfalar)
● Do not mount the equipment with the back panel facing downward.
ReadyRails installation
To easily configure your rack for installation of your S5148F-ON switch, use the ReadyRails rack mounting system provided.
You can install the ReadyRails system using the 1U tool-less method or one of three possible 1U tooled methods—two-post flush
mount, two-post center mount, or four-post threaded mount.
CAUTION:
Do not use the two-post methods if you need your switch to be NEBS Earthquake Z4-compliant.
To begin installation, separate each rail assembly by sliding the inside rail out of the outside rail.
NOTE:
For more installation instructions, see the installation labels attached to the rail assembly.
Figure 8. Separate rails
Tool-less square-hole installation
NOTE:
For more installation instructions, see the installation labels attached to the rail assembly.
CAUTION:
Your switch is not NEBS Earthquake Z4-compliant if you this installation method.
1. With the ReadyRails flange ears facing outward, place one rail between the left and right vertical posts. Align and seat the
back flange rail pegs in the back vertical post flange. The following shows how the pegs appear in both the square and
nonthreaded round holes:
S5148F-ON switch installation
19