Dell PowerConnect B-DCX-4S Backbone Değiştirme Prosedürü - Sayfa 15

Anahtar Dell PowerConnect B-DCX-4S Backbone için çevrimiçi göz atın veya pdf Değiştirme Prosedürü indirin. Dell PowerConnect B-DCX-4S Backbone 16 sayfaları. Power supply and filler panel
Ayrıca Dell PowerConnect B-DCX-4S Backbone için: Değiştirme Prosedürü (6 sayfalar)

TABLE 2
Cable routing table for PowerConnect B-DCX-4S (48 ports shown) (Continued)
Slot/port
Cable labels
Slot
Port
Switch end
43
44
45
46
47

Powering on the PowerConnect B-DX-4S

DANGER
Use the supplied power cords. Ensure the facility power receptacle is the correct type, supplies the
required voltage, and is properly grounded. (D004)
1. Connect the two AC power cords to each of the two power supplies.
2. Connect the power cords to a power source with a voltage of 200 to 240 VAC, 47 to 63 Hz.
3. Turn the AC power switches on the power supplies to ON. The AC power switches light green when switched on
and power is supplied.
4. The PowerConnect B-DCX-4S performs a power-on self-test (POST) each time it is powered on. POST takes
approximately ten minutes and is complete when the indicator light activity displays the operational state. For
information about LED patterns, see the PowerConnect B-DCX-4S Backbone Hardware Reference Manual.
You can bypass POST by using the fastBoot command. You can also disable POST for successive reboots on the
PowerConnect B-DCX-4S using the diagDisablePost command.
ATTENTION
Do not connect the switch to the network until the IP addresses are configured.
PowerConnect B-DCX-4S Chassis Replacement Procedure
53-1001800-01
Connected device
Device end
Slot/port of device
15