Dell S4100-ON Series Kurulum Kılavuzu - Sayfa 19

Anahtar Dell S4100-ON Series için çevrimiçi göz atın veya pdf Kurulum Kılavuzu indirin. Dell S4100-ON Series 47 sayfaları.
Ayrıca Dell S4100-ON Series için: Kurulum Kılavuzu (21 sayfalar), Kurulum Kılavuzu (48 sayfalar), Kurulum Kılavuzu (49 sayfalar)

Dell S4100-ON Series Kurulum Kılavuzu
To install the S4100–ON Series (S4128F-ON and S4148F-ON), complete the installation procedures in the order presented in this section.
Always handle the S4100–ON Series switch and its components with care. Avoid dropping the switch or any field replaceable units (FRUs).
NOTE:
ESD damage can occur if components are mishandled. Always wear an ESD-preventive wrist or heel ground strap when
handling the S4100–ON Series switch and its components. As with all electrical devices of this type, take all the necessary safety
precautions to prevent injury when installing this switch.
NOTE:
For more information, see the
Topics:

Unpack the switch

Rack or cabinet installation
ReadyRails installation

S4100-ON Series installation

Optics installation
Switch power-up
After switch installation
Unpack the switch
NOTE:
Before unpacking the switch, inspect the container and immediately report any evidence of damage.
When unpacking the S4100–ON Series switch, make sure that the following items are included:
One S4100–ON Series (S4128F-ON and S4148F-ON) switch
One RJ-45 to DB-9 female cable
Two sets of rail kits, no tools required
Two PSUs
Four fan units
Two country- and region-specific AC power cords
Dell S4100–ON Series Setup Guide
Safety and Regulatory Information
Warranty and Support Information

Unpack

1
Place the container on a clean, flat surface and cut all straps securing the container.
2
Open the container or remove the container top.
3
Carefully remove the switch from the container and place it on a secure and clean surface.
4
Remove all packing material.
S4100–ON Series installation
Open Networking Hardware Diagnostic Guide .
S4100–ON Series installation
4
19