Align and seat the back flange rail pegs in the back vertical post flange. To see how the pegs appear in both the square and
unthreaded round holes, see item 1.
2
Align and seat the front flange pegs in the holes on the front side of the vertical post.
3
Repeat this procedure for the second rail.
4
To remove each rail, pull on the latch release button on each flange ear and unseat each rail.
Figure 10. 1U tool-less configuration
Two-post flush-mount configuration
CAUTION:
Your system is not NEBS Earthquake Z4-compliant if you use this installation method.
1
For this configuration, remove the castings from the front side of each ReadyRails assembly, item 1.
Use a Torx driver to remove the two screws from each front flange ear and remove each casting. Retain the castings for future rack
requirements. Removal of the back flange castings is not necessary.
2
Attach one rail to the front post flange with two user-supplied screws, item 2.
3
Slide the plunger bracket forward against the vertical post and secure the plunger bracket to the post flange with two user-supplied
screws, item 3.
4
Repeat this procedure for the second rail.
20